Before energy change (~9 am), we plan to do the following:
(we already completed the initially planned data taking)
Because of large hydrogen background at low p settings for Pb+LH2
target, we added LH2 running for all the low P settings (going up
if time allows). We also would liek to take right arm at 922.593 MeV for He and Pb (which are the only settings do not have right arm data). Left will take some calibration data for NaI detector
check-out, at 30 degree, 950 MeV with HV=1700 (as it is now
for most of the data taking), and 1900, 1000.