    User name E.Chudakov

    Log entry time 23:59:41 on October29,2007

    Entry number 210541

    keyword=Swing shift summary

    Crew: E.Chudakov, Youcai Wang

    16:00 no beam (MCC work in progress)
    17:30 beam permit
    18:00 control access again, to work on the right dipole, which had quenched
    18:30-21:00 working on the magnet. Bob is working on the trigger
    21:30- asked for beam, the right dipole is ramping up.
    24:00 - MCC is still doing the beam tuning. The right dipole
    is OK.