Main INDEX
Monthly INDEX
PREV
NEXT
User name Kumbartzki
Log entry time 23:58:28 on November 3,2007
Entry number 212076
keyword=Swing shift summary
MCC is working on the beam, doing harp scans (Dummy target, 5μA)
It is 17:17 not much has happend.
17:56 The harp scans are now acceptable 160 and 249
we asked for 50 μA
checked raster first: got 2 x 2.5 (asked for 5X6 to get that).
Start actual data taking finishing 697.97 kinematics
Run 1805 dummy target
Set new kinematics on left to 650.754 and right already to the next setting 606.751
Start with carbon/Fe/dummy/H(Pb)/He
1806,1807,1808,1809,1810 and 1811 for the left
for right we took data starting with dummy (20473).
After changing the kinemtic at the left arm to 606.751
continue to take left and right arm data.
There is noise on the left arm VDC wires. Alexandre is looking into it. Found bad PMT interfering with electronic. Data from left arm may be not useful.
Change momentum on right arm before left arm setting measuremnts are finished.
Beam position was adjusted and new data start with runs 1821 and 20482
The beam position is not very stable.
We managed to get to 527.715 and finished 4 targets.