• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Sirca

    Log entry time 09:11:20 on November 5,2007

    Entry number 212632

    keyword=LHe vented, controlled access

    At about 08:40 we moved the target from He (loop 1) to Fe.
    Approximately during the start of run 1983 on Fe (with 50 uA),
    the loop 1 heater started to shoot up to about 250 W within
    a minute, then rapidly ramped down to about 90 W, both values
    being beyond HIHI and LOLO, respectively. This was a few minutes
    after the beam was taken away from He.

    Called Jian-Ping who said the target has vented and called
    for controlled access. Expected down 1-2 hours.