Main INDEX
Monthly INDEX
PREV
NEXT
User name S. Sirca
Log entry time 09:11:20 on November 5,2007
Entry number 212632
keyword=LHe vented, controlled access
At about 08:40 we moved the target from He (loop 1) to Fe.
Approximately during the start of run 1983 on Fe (with 50 uA),
the loop 1 heater started to shoot up to about 250 W within
a minute, then rapidly ramped down to about 90 W, both values
being beyond HIHI and LOLO, respectively. This was a few minutes
after the beam was taken away from He.
Called Jian-Ping who said the target has vented and called
for controlled access. Expected down 1-2 hours.