A UPS has been installed for the Dipole quench detection and Dipole He
level circuits to provide a dedicated power source for the Wang
protection circuit. The lead flow circuits are still routed through the
wang protection circuit, Securing power on the Wang protection Circuit
UPS.... WILL FAST DUMP THE MAGNET POWER SUPPLY.
A copy of this log entry has been emailed to: fansler@jlab.org, segal@jlab.org