Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 07:29:24 on November16,2007
Entry number 214814
keyword=optics study with left spectrometer
Left spectrometer completed production data taking. While waiting for right arm to settle into the last momentum, we are taking optics data on the left arm. Sieve slits in.
For LH2, p=2293 MeV, dp=+2%, run 2494
p=2248 MeV, dp=0%, run 2495
p=2202.075 MeV, dp=-2%, run 2496
For optics target, p=2202.075 MeV (QE), run 2497.