• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 05:15:24 on November28,2007

    Entry number 216647

    keyword=CHL crashed, targets warmed up, He loop vented.

    CHL crashed, Both loop 1 and 3 warmed up. Helium target vented.
    I instructed target operator to reduced both loop 1 and 3 fan to 10 %,
    and turned loop 1 HP heater to 0 watts with manual control.
    Will need to wait for CHL recovered before re-cool-down the targets.