Main INDEX
Monthly INDEX
PREV
NEXT
User name BT, Hu
Log entry time 07:59:15 on November28,2007
Entry number 216651
keyword=shift summary
0:00 beam back, adjusted the beam position and reduced the compton rate
0:54 started taking data
2:03 change left p to 579.593MeV/c, change right p to 540.394MeV/c
2:59 change left p to 540.394MeV/c
3:57 change left p to 503.845MeV/c, change right p to 469.769MeV/c
4:15 beam triped because of FSD trip. CHL flow is very low (around 3). and our target alam keeps beeping. MCC persons are working on it. They said they would take some time to fix it. We have to wait.
5:30 MCC call us that they will controled access and warm up the target.
7:40 MCC finish controled access.
theta=120 E=645.9 Prodution run
left arm
p=621.636 GeV/c
2907 Fe beam adjustment
2908 Fe beam adjustment
2909 Fe 50uA 0:54-1:00 67k
2910 C 50uA 1:05-1:10 29k
2911 Dummy 50uA 1:15-1:20 73k
2912 Pb 50uA 1:38-1:47 307k
2913 He 50uA 1:53-2:00 112k
p=579.593MeV/c
2914 He 50uA 2:06-2:12 113k
2915 Pb 50uA 2:20-2:25 202k
2916 Dummy 50uA 2:32-2:37 97k
2917 C 50uA 2:42-2:48 34k
2918 Fe 50uA 2:52-2:57 65k
P=540.394MeV/c
2919 Fe 50uA 3:01-3:07 74k
2920 C 50uA 3:11-3:16 29k
2921 Dummy 50uA 3:21-3:27 120k
2922 Pb 50uA 3:32-3:39 250k
2923 He 50uA
p=503.845MeV/c
2924 He 50uA
2925 Pb
right arm
p=621.636 MeV/c
21180 Fe beam ajustment
21181 Fe beam ajustment
21182 Fe 50uA 0:54-1:00 21k
21183 C 50uA 1:05-1:10 8k
21184 Dummy 50uA 1:15-1:20 26k
21185 Pb 50uA 1:38-1:47 132k
21186 He 50uA 1:53-2:00 39k
p=540.394 MeV/c
21187 Fe 50uA 2:52-2:57 21k
21188 Fe 50uA 3:01-3:07 24k
21189 C 50uA 3:11-3:16 8k
21190 Dummy 50uA 3:21-3:27 43k
21191 Pb 50uA 3:32-3:39 108k
21192 He 50uA