• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Nilanga

    Log entry time 15:57:41 on November28,2007

    Entry number 216687

    keyword=shift summary

    9:10 CHL control room called and told us we can start to cool down the target. Dave Meekins was paged here to start cooling.


    13.25: MCC calls, ready to give beam back. Beam size not good; tunning.

    14.35: MCC gives good beam, move the lead target in for production

    14.55: spot check indicates that the raster size at the target not good; MCC trying to fix this.

    15.30: finally the raster looks OK ready for data.

    15.50-16.00 production