    8:00-10:00 Beam unstable. MCC testing beam. Target changed to Carbon
    10:00 Controlled Access requested. Beam studies. Alex, Dustin and Luis down in 
    Hall,
    12:50 Beam permit. Beam studies are still on
    14:10 Beam back. Quality not very good. Request MCC 
    15:38 Beam ok. Target changed to Slant Thick Lead
    3205 15:41 start production with 10 uA increasing 10 uA every 5 min Run