User name Jack
Log entry time 09:23:58 on March 04, 2008
Entry number 228571
keyword=Detector work yesterday
Yesterday the detectors were installed in the Left Arm and the Detector
Stack pulled back into the Shield House. Some gas connections and
cabling still need to be done. The bottom S1 paddle still needs to be
rotated. The present configuration is now: VDCs, S1, SC1, Gas
Cerenkov(short), SC2, S2(not S2m), Carbon Doors, SC3, SC4, Pion Rejector.