• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Jack

    Log entry time 17:51:11 on March 10, 2008

    Entry number 228577

    keyword=Right Arm Detector Stack

    The Right Arm Detector Stack is back in the Shield House. The configuration is: VDCs, S1, Gas Cerenkov(long), S2(not S2m), Pre-Shower, Total Absorber. The CO2 is flowing to the Gas Cerenkov. The bottom S1 paddle is still rotated horizontal. Cabling still needs to be done.