Main INDEX
Monthly INDEX
PREV
NEXT
User name Jack
Log entry time 17:51:11 on March 10, 2008
Entry number 228577
keyword=Right Arm Detector Stack
The Right Arm Detector Stack is back in the Shield House. The
configuration is: VDCs, S1, Gas Cerenkov(long), S2(not S2m), Pre-Shower,
Total Absorber.
The CO2 is flowing to the Gas Cerenkov. The bottom S1 paddle is still
rotated horizontal. Cabling still needs to be done.