    User name folts

    Log entry time 16:03:11 on March 29, 2008

    Entry number 228994

    keyword=checklist

    The pre beam checklist is complete but all guards are still installed

    The spectrometer magnets are not operational

    All beam line systems are operational the target is in an open position and it is OK to send beam to the dump when cleared by the run coordinator