Main INDEX
Monthly INDEX
PREV
NEXT
User name Dezern
Log entry time 16:44:17 on March 31, 2008
Entry number 229217
keyword=Checklist
Check list complete, target window and spectrometer guards are
removed....except right spectrometer window guard stays on, and right
side target guard stays on. Angle limits for the left spectrometer are
14 degrees to 70 degrees. There are no angle limits on the right
spectrometer the right spectrometer will remain in place, power to the
bogies is secured. The tech on call at start up is Gary Dezern. The
left Q3 is a work in progress.
A copy of this log entry has been emailed to: folts@jlab.org