User name Yi Qiang
Log entry time 00:14:23 on April16,2008
Entry number 232248
Followups:
keyword=Swing Shift Summary
Shift Workers
======================================================================
SL: Yi Qiang
TO: Youcai Wang
3rd: Xiaohui Zhan
Shift Summary
======================================================================
16:00 Shift start with no beam
20:30 After a sharp alarm, the target temperature rised suddenly.
The high power heater is out of control ( ~600W), so we turned
it off.
The readback of fans in both loop1 and loop2 are broke too.
We tried to reboot the IOC twice, no success and we even lost
the control of fans.
Paged JP without response and then we paged Dave upon RC's permit.
21:30 Asked for controlled access for Dave to fix the target control.
22:30 Target control fixed, however we still need some time to cool
the target down. Thanks to Hall C for lowering down beam current
to allow us to use more coolant.
24:00 Target cool down almost down! Thanks to Dave.