User name jpchen
Log entry time 00:21:32 on June 6,2008
Entry number 241196
keyword=Swing shift summary
Swing shift summary:
Shift workers: J. P. Chen (SL), Z. Ye (TO), I. Pomerantz (3rd)
16:00-24:00 Mostly smooth running: Kin. 1, 2%, LHRS=0.6286 GeV/c.
16:20-16:35 beam off due to magnets problem.
~24:00 target fan fluctating, raised from 23% to 25% (60Hz).
Run summary (first run for this kinematics is run 1912, only 24K)
1913. 5M. total=5M,
1914, 5M, total=10M.
1915, 5M, total=15M.
1916, 5M, total=20M.
1917, 5M, total=25M.
1918, 5M, total=30M.
1919, 5M, total=35M.
1920, 5M, total=40M.
1921, 5M, total=45M.
1922, 5M, total=50M.
1923, 5M, Total=55M.
1924, still on-going at the end of shift.