Main INDEX
Monthly INDEX
PREV
NEXT
User name chiranjib
Log entry time 02:38:35 on October 11, 2008
Entry number 243645
keyword=LASER alignment status in the HALL
Laser alignment is done for the longitudinal line. Hall A CANS system is
not engaged NOW. All lasers turned OFF.
Flashing lights on the ramp side as well as on the beam enclosure entry
side are still ON
Laser alignment will resume at 10 A for the second line and will
continue till midnight.
Please make sure with Yi Qiang ( page or call) if you plan to go into
the Hall after 9:30 A.and check the log for the change in any status onwards.