• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name chiranjib

    Log entry time 02:38:35 on October 11, 2008

    Entry number 243645

    keyword=LASER alignment status in the HALL

    Laser alignment is done for the longitudinal line. Hall A CANS system is not engaged NOW. All lasers turned OFF. Flashing lights on the ramp side as well as on the beam enclosure entry side are still ON Laser alignment will resume at 10 A for the second line and will continue till midnight. Please make sure with Yi Qiang ( page or call) if you plan to go into the Hall after 9:30 A.and check the log for the change in any status onwards.