User name V. Sulkosky
Log entry time 22:30:27 on October 15, 2008
Entry number 243713
keyword=Left HRS DAQ Reconnected
With Kalyan's help, I have reconnected the cables between the left HRS and
BigBite weldment. The cables are now fastened to the left HRS detector
stack. If the stack needs to come out, either Kalyan or I should be
notified so we can take the cables back down.
I verified that we are receiving the signals sent from the BigBite
weldment. Kalyan is taking data with the BigBite configuration, so
tomorrow morning, I will start testing the left HRS configuration.
A copy of this log entry has been emailed to: segal@jlab.org,kalyan@jlab.org,rom@jlab.org,camsonne@jlab.org