• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Moffit

    Log entry time 12:07:10 on October 24, 2008

    Entry number 244520

    keyword=Hall A Sweep at 4pm.

    Our current plan is to have the Hall Swept at 4pm.

    Beam tune should occur during Swing and Owl shift. Target operator is required for each of these shifts.

    We are expecting to require a full shift starting Saturday DAY. All shifts until then are on STANDBY (please be close to site, as you may be called in).



    A copy of this log entry has been emailed to: kalyan@jlab.org, yqiang@jlab.org, vasulk@jlab.org, camsonne@jlab.org, rom@jlab.org, xiaodong@jlab.org, brads@jlab.org