User name jpchen
Log entry time 18:42:05 on October 31, 2008
Entry number 245744
Followups:
keyword=target activities today
This morning, reference cell broke (at the joint of one end window).
With RADCON support, Joe replaced it with a new one. Scot/Ed installed
new He jets to the beam line Be window. The flow was set to be ~5 m^3/h.
Yi and company moved the EPR RF amplifier to the pivot floor with shield.
Yi and JOe are current lowering the EPR RF coil in the oven.
Once this is done, the plan is to start heating up oven, test both
transverse and vertical optical lines, and test EPR.