    keyword=target activities today

    This morning, reference cell broke (at the joint of one end window). With RADCON support, Joe replaced it with a new one. Scot/Ed installed new He jets to the beam line Be window. The flow was set to be ~5 m^3/h. Yi and company moved the EPR RF amplifier to the pivot floor with shield. Yi and JOe are current lowering the EPR RF coil in the oven. Once this is done, the plan is to start heating up oven, test both transverse and vertical optical lines, and test EPR.