2) After Scot finished his work, Joe and I took out the new reference cell, target ladder and He3 cell. Visual check of the He3 cell showed no damage of the cell.
3) With cell removed, we tried to lower the EPR RF coil inside the oven. As a result, the cell was lowered by about 1.5 cm.
4) Chiranjib cleaned the oven window after we fixed the EPR RF coil.
5) Yi' made one more RTD cable for the reference cell to replace the broken one in owl shift. I removed the broken RTD and put in the new one. It turned out that the broken RTD was actually burned, therefore it's very possible that during the position test with the reference cell, beam accidentally hit the wall of the reference cell and destroyed it.
6) Upon Ed's request, we re-allocated the EPR RF amplifier to the steel platform and built a lead shelter for it.
7) Removed the cell wall collimators.
8) Jian-ping, Jin, Yi' and Chiranjib are still working on the alignment
of the transverse laser at this moment.
A copy of this log entry has been emailed to: jpchen@jlab.org, brads@jlab.org