• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name adaq

    Log entry time 16:00:49 on November 2, 2008

    Entry number 246270

    keyword=Beam Time Accounting
    Hall A

    11/02/08 0800-1600
    Experiment #: E06-010
    Shift Leader: E. Schulte
    Shift Workers: Y. Zhang, C. Chen

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    0.000.670.000.330.750.000.000.332.08
    Beam Available
    but Not in Use
    0.000.080.530.250.070.080.000.301.31
    Beam Not Available
    or Unacceptable
    1.000.250.470.420.180.921.000.364.60
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    1.000.920.330.750.750.500.000.334.58
    Planned Config-
    uration Change
    0.000.080.670.250.250.000.000.251.50
    Unplanned
    Experiment Down
    0.000.000.000.000.000.501.000.421.92
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.501.000.421.92
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00
    Bbite0.000.000.000.000.000.000.000.000.00

    Comments: 08:00 No beam, optics target in 09:15 Start checking beam positions after return of CW beam. 10:00 Requested a harp scan from MCC 10:20 MCC reported results of harp scan. Setting up for 3He running. 11:00 First NMR complete. 11:25 Change to 3He target. This required a polarization change, which takes a little while. 11:34 Start raster scan 12:00 Recheck NMR measurement before production. 12:04 Request 5uA with 4x4 raster on 3He target for production running. 13:30 Cryo excersion took out HRS-L Q3, and the target polarization dropped t 14%--This was a minsomer. 14:00 Still waiting for word from cryo. RC has been updated. 14:18 Cryo On-Call just called to let us know that he'll be here in about 5 minutes. 15:10 Cryo got the level back on the Q3 and it reset remotely.

    Data Entry by: E. Schulte