• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name xqian

    Log entry time 01:43:17 on November 06, 2008

    Entry number 247042

    keyword=BigBite Wire Chamber running condition study

    WE did the study for the threshold and HV scan for wire chamber. The results of the background rates and tracking efficiency are listed in the following plot. It seems that we are quite same to run at the 4.5V condition with 1600V. Now we set the threshold of C2 and C3 to 4.4V.




    Figure 1