Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name E. Cisbani
Log entry time 00:04:31 on November11,2008
Entry number 248039
keyword=Swing Shift summary
Swing Shift Summary (11/10/2008)
16:05 Vacuum problem in the beam line reported by MCC; run 3172 ended
17:15 Few RICH Test Run 3173
22:00 Happex run stop
22:20 Beam Back: check position with BeO;
Moved to He3
Spot check at 4x4 MCC
22:30 Happex run started 30398
22:40 Start Production run 3181