    User name averett

    Log entry time 16:04:13 on November12,2008

    Entry number 248414

    keyword=Day Shift Summary


    Day Shift Summary

    0823 Begin Production running at 8uA with polarized target. Target field is
    transverse.

    11:00 Move to Empty target position for Compton Chicace tuning.


    13:35 MCC is not having luck getting the beam through Compton because of
    trips at the eP ion chamber.

    15:30 MCC has tuned beam through Compton Chicane. Will now try to put the beam
    at the correct positions on 1H04A,B as determined by previous owl shift.

    1H04A should be (1.0, 1.3)
    1H04B should be (-1.5, 1.0)

    16:00 Beam centered and raster on. Run SPOT++. spot is about 3x3 as required.
    JP explains that the positions above are not correct for production cell,
    but for reference cell. Next shift will need to center beam and check raster.