User name Lindgren
Log entry time 16:06:01 on November28,2008
Entry number 251201
keyword=day shift summary:
Day Shift Nov 28 8:00 AM
Richard Lindgren SL
Peter C. Bradshaw TO
Franco 3rd
Plans for the today:
* Production running
* Nov 28 morning: go to the transverse target orientation. Do Moller during this period
8:00 AM Beam off
Beam Current 11.9 ua
8:21 AM Start Run 4003 charge 0.03119
9:15 AM Start Run 4004 Charge 0.01900 Stop 9:45 AM
9:50 AM Start spin rotation to transvers spin orientation
Target guys doing EPR and NMR measurements.
10:55 AM Eugene conducting a Moller measurement
14:40 Moller measurements are complete and getting ready to return to
production running
14:50 Checked pulsed beam on Beam. Lowered beam to centerit.
14:55 Making an EPR porization measurement
Results of changing raster size
current size Rate T1 Rate T3 Rate T5
2.00 2x2 11.2 KHz 225 Hz 15.5 Hz
1.99 3x4 10.8 KHz 199 Hz 13.7 Hz
1.98 5x6.6 11.51 KHz 221 Hz 15.0 Hx
15:45 Moller resulte 80.5% beam polarizatiion
15:50 Curent 12 ua
Poduction running on reference cell
Most of the day was spent on:
6 hrs of polarization measurements
2 on target
4 on Moller
End Day shift