• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name R. Michaels

    Log entry time 03:43:45 on November30,2008

    Entry number 251407

    This entry is a followup to: 251402

    keyword=junk runs, power-cycled TS11

    Runs 4046 - 4051 are junk. The DAQ deadtime became high.
    Even with beam off and ps8=2 the DT was 58%.
    Took access and power cycled TS11. This fixed the scaler = -1
    problem and now DT = 2% with ps8=2.
    Will do a raster check (runb 4052) and try production again.