    Log entry time 00:00:20 on December21,2008

    Entry number 254213

    keyword=Swing shift summary

    Swing Shift Summary
    Shift started with run 4636, Compton run number is 30604
    16:37 ended run 30604. MCC called about magnet problem. The beam should be back soon. Charge: 0.02546
    16:56 MCC called about a power supply problem which tripped three times in less than 1 hour. They are calling in expert to look into this. Stopped spin flip and moved the target to empty position.

    Run 4637 Spot++ run with BeO target to check the beam position,
    17:58 Started 3He production run 4638 ended 18:56 charge:0.04208
    18:57 started run 4639 ended 19:56 charge:0.04207
    run 4640 short run, stopped to restart the HAPPEX DAQ (run 30605)
    19:58 started Run 4641 ended 21:02 charge: 0.040 (estimated), end-of-run file looks very different from others.
    21:02 started run 4642 ended 22:00 charge: 0.04218
    ROC9 did not respond during run 4643 so restarted CODA
    22:10 started run 4644 run ended 23:08 charge: 0.04204
    23:08 started run 4645

    Total charge this shift: 0.23383