    User name Jin Huang

    Log entry time 00:19:49 on January 13, 2009

    Entry number 255695

    keyword=Swing Shift Summary

    
    Shift Leader/Worker : Jin Huang. 
    Al Tobias also helped a lot.
    
    Start with MCC sweeping the Hall into Controlled Access.
    Then Xin, Kalyan, Alex and Youcai went down to finish up detector work.
    
    17:30  Cycle/set LHRS to +2.350GeV/c
    19:23  Target internal Temp. test
    21:52  RICH people exit the Hall and Beam permit is requested
    21:59  Call for beam tuning with compton to BPMA = (0.0 1.7); BPMB = (-
    1.5 1.2)
    22:52  Bigbite HV is OFF
    23:08  MCC call for Target -> BeO to continue beam tuning
    23:13  MCC restored old BPM position and begin tuning through Compton.