NEXT
Make New Entry,
Make Followup Entry
User name Jin Huang
Log entry time 00:19:49 on January 13, 2009
Entry number 255695
keyword=Swing Shift Summary
Shift Leader/Worker : Jin Huang.
Al Tobias also helped a lot.
Start with MCC sweeping the Hall into Controlled Access.
Then Xin, Kalyan, Alex and Youcai went down to finish up detector work.
17:30 Cycle/set LHRS to +2.350GeV/c
19:23 Target internal Temp. test
21:52 RICH people exit the Hall and Beam permit is requested
21:59 Call for beam tuning with compton to BPMA = (0.0 1.7); BPMB = (-
1.5 1.2)
22:52 Bigbite HV is OFF
23:08 MCC call for Target -> BeO to continue beam tuning
23:13 MCC restored old BPM position and begin tuning through Compton.