    User name adaq

    Log entry time 00:03:56 on January 15, 2009

    Entry number 256143

    keyword=Beam Time Accounting
    Hall A

    01/14/09 1600-2400
    Experiment #: E06-010
    Shift Leader: A. Puckett
    Shift Workers: A. Kolarkar, R. Gilman

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.010.570.940.910.950.960.960.916.21
    Beam Available
    but Not in Use
    0.800.410.020.070.020.030.010.021.37
    Beam Not Available
    or Unacceptable
    0.200.020.040.020.040.020.030.070.44
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    0.020.581.001.001.001.001.001.006.60
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    0.980.420.000.000.000.000.000.001.40
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.980.000.000.000.000.000.000.000.98
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.420.000.000.000.000.000.000.42
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00
    Bbite0.000.000.000.000.000.000.000.000.00

    Comments: Shift started in controlled access, which consumed most of the first hour. This was to put the lumi back in the DAQ and to fix the RICH detector. During the second hour (17:00-18:00), there was a loss of communication with the left HRS magnets and detectors, resulting in an IOC reboot which also required a power-cycling of the left dipole NMR. After the second hour, it was smooth data taking for the next six hours

    Data Entry by: A. Puckett