    User name A. Puckett

    Log entry time 00:01:53 on January16,2009

    Entry number 256280

    keyword=Swing shift summary

    At the start of swing shift, the beam was off to fix some problems in the injector. Shortly into the shift, MCC called and asked to send tune beam and requested that we move to the empty target position. We went to bring up the target motion GUI only to find that it was missing. We tried rebooting the target IOC, and once that was done, the motion GUI still wouldn't appear. Instead, a window with an error message popped up telling us that the .edl file for the motion control GUI could not be opened for reading. We tried to find some more information on the file and discovered that it appeared to be hosted on a hall B web server and no longer existed. Eventually Yi paged the software expert on call via MCC, who was able to restore the file. At that point, MCC was able to tune up our beam, and we started taking production data. At first, they couldn't get us to 13.5 uA, so they had to do some further injector tests, which only took about ~15-20 minutes, and by about 18:30, we were taking production data on 3He at 13.5 uA again.

    Production runs list:
    Run, start time, stop time, BCM u3 charge
    5195, 18:37, 19:38, .04716
    5196, 19:40, 20:11, .02368
    5197, 20:12, 20:16, .002798
    5198, 20:17, 21:17, .04734
    5199, 21:19, 22:22, .04725
    5200, 22:25, 23:28, .04713
    5201, 23:30, continued into night shift