keyword=beam permit, L1A problem fixed
We took access from 0:30 to 1:20 to investigate the L1A
double pulsing on L-HRS.
While I traced where the cables go, the problem disappeared,
apparently just touching the cable. I replaced the 5 nsec cable
from the thick L1A to the TM module. The new cable is 4 nsec
(note, this will make a small T0 change !!). I also hand-tightened
the connectors on the thick L1A cable.