NEXT
Make New Entry,
Make Followup Entry
User name R. Subedi
Log entry time 07:57:10 on January18,2009
Entry number 256617
keyword=Run Coordinator Report: Jan 16 (Swing)-17, 2009
Run Coordinator Report for Jan 16(Swing)-17, 2009:
# Polarity status of the spectrometers: BigBite -ve (for e-), L-HRS +ve (for &pi+)
# &pi+Transverse mode with the half-wave-plate IN
Charge Accumulated Summary So Far
Half Wave Plate Charge Expected (C) Charge Accumulated (C) Comment
&pi+ Transverse IN 3.5 4.5 -
&pi+ Transverse OUT 3.5 3.66 Done
Overall Plans
1. Will stay at Pi-plus Transverse mode until Sunday 10:00 (Jan 18).
2. Will go to Pi-plus Vertical mode on Sunday Day shift (~10:00).
3. Will do Moller measurement either on Tuesday or Wednesday.
4. Will do positron runs on Thursday (Jan 22) Day/Swing and Swing/Owl(Friday) where
Day/Swing [total one shift, starting ~11:00]: BigBite +ve polarity and L-HRS +ve
Swing/Owl [total one shift, starting ~19:00]: BigBite +ve polarity and L-HRS -ve
5. Friday (Jan 23) Day: BigBite will be back to -ve polarity, L-HRS stays at -ve polarity.
Jan 16(Swing), 2009
Activities
-Compton rate started degrading towards the end of the day-shift by fluctuating between a couple of hundred Hz to a kHz
- Otherwise a smooth production in &pi+ Transverse mode
Beamtime Accounting:
ABU BANU BNA
Swing 7.32 0.37 0.31
Jan 17, 2009
Activities
- R. Michaels et. al., during early Owl shift, fixed most of the deadtime, scaler overcounting issues
by taking an access into the hall (suspect a loose cable).
-10:40-13:40 BigBite High Voltage mainframe swapped with a working one. The HV problem started
late Owl shift, but only noticed at 10:30. Also ESR-work commences at 11:00 and finished at 12:20.
Takes additional time to bring the HRS magnets back to normal due to cryo-instability.
During this downtime, various people worked on the deadtime, BB-cherenkov, RICH and other pending issues
in the hall. Also, Yi did target internal temperature test.
-Production in &pi+ Transverse mode
-The Compton rate becomes worse: ~10 kHz/uA, urged MCC (12:30) to investigate into
the beam quality while we are still down to bring the magnet's cryo-level stable after the ESR-work.
-13:10 Magnet cryo-levels are ok.
-14:00 Before taking production data, again asked MCC to tune the beam for Compton quality (photon rate <500 Hz/uA).
-14:30 Compton stops working (suspect too high background), asked to stop beam tunig, resumes production
while troubleshooting Compton problem.
Beamtime Accounting:
ABU BANU BNA Comment
Owl 5.81 1.11 1.09 Took access to fix deatime, scaler overcounting, etc.
Day 2.06 3.70 2.24 Took access to swap BB HV mainframe, other various works during ESR down.
Swing 7.51 0.23 0.25