NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 14:10:25 on January 18, 2009
Entry number 256688
keyword=Experiment Summary for Jan 13, Owl - Jan 14, Swing
Summary for Jan 13 owl - Jan 14 swing
Startup and production running.
Beam in Use
shift |
ABU |
BANU |
BNA |
2009/01/13 owl | 5.62 |
1.44 | 0.94 |
2009/01/13 day | 5.61 |
1.71 | 0.69 |
2009/01/13 swing | 1.36 |
4.25 | 2.41 |
2009/01/14 owl | 7.42 |
0.20 | 0.35 |
2009/01/14 day | 3.17 |
1.26 | 3.58 |
2009/01/14 swing | 6.21 |
1.37 | 0.44 |
total | 29.4 |
10.2 | 8.4 |
Main events/issues:
January 13, 2009
- Jan. 13, 00:00 - 03:30 beam tuning, position and profile check.
- Jan. 13, 03:30 - 06:00 detector checkout and current optimization.
- Jan. 13, 06:20 - 10:00 nitrogen and hydrogen reference cell runs.
- Jan. 13, 10:00 - 16:40 Moller spin dance, optimal Wien angle 30
degrees.
- Jan. 13, 16:40 - 17:44 MCC beam tuning after spin dance.
- Jan. 13, 17:44 - 19:45 RICH tests and beam position check for
production.
- Jan. 13, 19:45 - 20:45 Controlled access for DAQ work.
- Jan. 13, 20:45 - 23:45 More beam tuning and Hall B startup.
January 14, 2009
- Jan. 13, Began production running at 13.5 uA.
- Jan. 14, Production for pi+, Transverse pumping.
- Jan. 14, 08:25 - 09:10 DAQ RICH problem.
- Jan. 14, 09:30 - 12:20 Beam studies for injector work.
- Jan. 14, 12:27 Begin production running again.
- Jan. 14, Compton tune and Hall A slit closed to 28, rate 100 Hz/uA.
- Jan. 14, 15:30 - 16:25 Controlled access for Lumi and RICH work.
- Jan. 14, 16:52 - 17:27 Beam tuning and IOC reboot of left and
right HRS controls.
- Jan. 14, 17:27 resume production running for pi+, Transverse pumping.
- Accumulated Charge for Jan. 14th (pi+, Transverse pumping) 0.78 C.
- Total charge for pi+, Transverse pumping with BHWP IN: 1.93 C
(including December data).
A copy of this log entry has been emailed to: rsubedi