Log entry time 16:05:36 on January20,2009
Entry number 256990
keyword=Day Shift Summary
8:00 am: Production run 5345 in progress
8:54 am: BB HV on WCs 1 and 2 tripped. Stopped run.
9:00 am: Beam studies started (will last until 4:00 pm)
9:40 am: Xin enters hall
9:53 am: Jack enters hall (plans to ramp down Q3 (LHRS))
9:58 am: Xin left hall
10:10 am: Kalyan and Vince enter hall
10:20 am: Alexander enters hall
11:15 am: Chiranjib, Yi: Target calibration (EPR etc.)
12:07 pm: Barack Obama inaugurated as 44th president of US!!!
1:05 pm: Target calibrations finished. P = 56.3%
1:22 pm: Brad takes over LHRS DAQ.
4:00 pm: MCC called and informed us that Beam Studies are finished.
Brad is still in the hall, paged him.