    keyword=Day Shift Summary

    8:00 am: Production run 5345 in progress
    8:54 am: BB HV on WCs 1 and 2 tripped. Stopped run.
    9:00 am: Beam studies started (will last until 4:00 pm)
    9:40 am: Xin enters hall
    9:53 am: Jack enters hall (plans to ramp down Q3 (LHRS))
    9:58 am: Xin left hall
    10:10 am: Kalyan and Vince enter hall
    10:20 am: Alexander enters hall
    11:15 am: Chiranjib, Yi: Target calibration (EPR etc.)
    12:07 pm: Barack Obama inaugurated as 44th president of US!!!
    1:05 pm: Target calibrations finished. P = 56.3%
    1:22 pm: Brad takes over LHRS DAQ.
    4:00 pm: MCC called and informed us that Beam Studies are finished.
    Brad is still in the hall, paged him.