    keyword=Run Coordinator Report: Jan 20, 2009


    Run Coordinator Report for Jan 20, 2009:
    # Polarity status of the spectrometers: BigBite -ve (for e-), L-HRS +ve (for &pi+)
    # &pi+Vertical mode with the half-wave-plate IN
    Charge Accumulated Summary So Far

    Half Wave Plate Charge Expected (C) Charge Accumulated (C) Comment
    &pi- Vertical IN 3.5 0.86 -
    &pi- Vertical OUT 3.5 4.04 Done

    &pi-Transverse IN 3.5 0.62 -
    &pi- Transverse OUT 3.5 4.38 Done

    &pi+ Vertical IN 3.5 4.17 Currently here
    &pi+ Vertical OUT 3.5 3.72 Done

    &pi+ Transverse IN 3.5 4.5 Done
    &pi+ Transverse OUT 3.5 3.66 Done

    Overall Plans
    1. Will do Moller measurement on Jan 22, 7 PM.
    2. Will do positron runs on Thursday (Jan 22) Day/Swing and Swing/Owl(Friday) where

    Day/Swing [starting 07:00]: BigBite +ve polarity and L-HRS +ve
    Swing/Owl [starting 17:00]: BigBite +ve polarity and L-HRS -ve

    3. Friday 07:30: BigBite will be back to -ve polarity, L-HRS stays at -ve polarity.
    4. Will stay for about a week of production in &pi-Vertical mode.

    Activities
    - 09:00-17:25 Beam-study and restoration
    - Opportunistic work in the hall during beam-study time: LHRS/BigBite trigger,
    RICH, BigBite cherenkov, BigBite wire-chambers (gas check)
    - Target internal temperature test and NMR/EPR work from counting room during the downtime
    - After the restoration of beam, the BPM positions get changed: New settings:
    BPMA (x, y) = (-1.0, 2.2) BPMB (x, y) = (-0.4, 2.2)
    Old settings: BPMA (x, y) = (-1.4, 1.7) BPMB (x, y) = (-1.0, 1.2)
    - Confirmed from the analysis expert that the new BPM settings do not change any physics-result.
    - More frequent BigBite HV trips.
    - Compton signal and background at the same level due to Compton-lock in place, has to be unlocked
    to see them saperated (Fixed on Jan 21 08:20). Good Compton rate.
    - Production on polarized 3He in &pi-Vertical mode.

    Beamtime Accounting:
    ABU BANU BNA Comment
    Owl 7.34 0.14 0.55
    Day 0.91 0.03 7.03 Beam-study 09:00-17:25
    Swing 5.09 1.69 1.22 Frequent BigBite HV trips, beam tuning for BPM setting