User name LeRose
Log entry time 00:00:48 on January 23, 2009
Entry number 257353
keyword=Shift Summary (swing)
1/22/2009 Swing Shift
John LeRose (SL)
Abdurahim Rakhman (TO)
Oleksandr (Sasha) Glamazdin (3rd)
No beam at start of shift
16:05 Called for controlled to switch LHRS polarity to negative
17:21 Polarity change completed started cycling left arm quads
17:25 Bob thinks he fixed "the helicity problem" taking a test run
17:25 run 5456 is Bob's test run.
17:36 looks OK up here. Bob agrees down in the Hall. Clearing the Hall.
17:40 back to beam permit, but no beam
18:04 MCC says they have a magnet/box supply down and have called in experts.
18:48 Beam back, starting Moller measurement
19:40 After almost getting us beam, box supply goes bad again.
19:50 MCC says this could take hours. Will know better within the hour.
20:51 Tune beam coming
21:03 Setting for Moller
21:22 They now say no beam till at least 23:00
23:10 Extremely optimistic estimate is one more hour till beam
"They also serve who only stand and wait." -John Milton