Run Coordinator Report for Jan 22, 2009:
Half-wave-plate IN
Charge Accumulated Summary So Far
Half Wave Plate Charge Expected (C) Charge Accumulated (C) Comment
&pi- Vertical IN 3.5 0.86 -
&pi- Vertical OUT 3.5 4.04 Done
&pi-Transverse IN 3.5 0.62 -
&pi- Transverse OUT 3.5 4.38 Done
&pi+ Vertical IN 3.5 5.06 Done
&pi+ Vertical OUT 3.5 3.72 Done
&pi+ Transverse IN 3.5 4.5 Done
&pi+ Transverse OUT 3.5 3.66 Done
Overall Plans
1. Take positron runs for about 8 hours (Friday).
2. 13:00 (Friday) BigBite will be back to -ve polarity, L-HRS stays at -ve polarity.
3 Do Moller measurement.
3. Take 3He reference cell data for an hour.
4. Start production and stay for about a week of production in &pi-Vertical mode.
Activities
- MCC tunes beam for the first two hours through the magnet MQA9A23 which was causing the BigBite
HV trips. After that only one BB HV trip during Owl.
- 05:30 3He &pi+Vertical mode of production finishes.
- 05:30_06:40 3He reference cell data. The cell pressure stays constant at 125 psig during the run.
- 06:40 Call for controlled access to change BigBite polarity from - to + and to test the reference cell leak.
- 07:20 ARM finishes survey, tech-crew in the hall.
- 08:20 BigBite polarity change finishes. Target leak test continues.
- Target leak is found and repair is not possible in a couple of hours.
- 09:30 Beam permit
- After viewing beam through BeO and checking spot with different raster sizes positron production starts.
- 10:48- 11:05 BB HV trip recurs (3 times) due to a bad beam tuning, MCC says that ARC4 magnet is again a culprit.
- Due to beam problem positron runs with L-HRS as +ve polarity stops at 16:00 after accumulating 0.2 C of data.
- 16:00-17:40 Controlled access for the polarity change (+ to -) of L-HRS.
- No beam all Swing shift, Moller measurement will be done tomorrow (Jan 23) and must be done before Saturday Owl
after which Hall B will be down for more than 3 weeks.
Beamtime Accounting:
ABU BANU BNA Comment
Owl 3.83 2.06 2.11 MCC beam tune 2 hr, hall access 1.25 hr
Day 5.06 1.70 1.24 Hall access first 1.5 hr, accelerator magnet problem
Swing 0.0 1.59 6.41 Controlled access, accelerator magnet problem