    User name R. Subedi

    Log entry time 07:35:07 on January23,2009

    Entry number 257403

    keyword=Run Coordinator Report: Jan 22, 2009


    Run Coordinator Report for Jan 22, 2009:
    Half-wave-plate IN
    Charge Accumulated Summary So Far

    Half Wave Plate Charge Expected (C) Charge Accumulated (C) Comment
    &pi- Vertical IN 3.5 0.86 -
    &pi- Vertical OUT 3.5 4.04 Done

    &pi-Transverse IN 3.5 0.62 -
    &pi- Transverse OUT 3.5 4.38 Done

    &pi+ Vertical IN 3.5 5.06 Done
    &pi+ Vertical OUT 3.5 3.72 Done

    &pi+ Transverse IN 3.5 4.5 Done
    &pi+ Transverse OUT 3.5 3.66 Done

    Overall Plans
    1. Take positron runs for about 8 hours (Friday).
    2. 13:00 (Friday) BigBite will be back to -ve polarity, L-HRS stays at -ve polarity.
    3 Do Moller measurement.
    3. Take 3He reference cell data for an hour.
    4. Start production and stay for about a week of production in &pi-Vertical mode.

    Activities
    - MCC tunes beam for the first two hours through the magnet MQA9A23 which was causing the BigBite
    HV trips. After that only one BB HV trip during Owl.
    - 05:30 3He &pi+Vertical mode of production finishes.
    - 05:30_06:40 3He reference cell data. The cell pressure stays constant at 125 psig during the run.
    - 06:40 Call for controlled access to change BigBite polarity from - to + and to test the reference cell leak.
    - 07:20 ARM finishes survey, tech-crew in the hall.
    - 08:20 BigBite polarity change finishes. Target leak test continues.
    - Target leak is found and repair is not possible in a couple of hours.
    - 09:30 Beam permit
    - After viewing beam through BeO and checking spot with different raster sizes positron production starts.
    - 10:48- 11:05 BB HV trip recurs (3 times) due to a bad beam tuning, MCC says that ARC4 magnet is again a culprit.
    - Due to beam problem positron runs with L-HRS as +ve polarity stops at 16:00 after accumulating 0.2 C of data.
    - 16:00-17:40 Controlled access for the polarity change (+ to -) of L-HRS.
    - No beam all Swing shift, Moller measurement will be done tomorrow (Jan 23) and must be done before Saturday Owl
    after which Hall B will be down for more than 3 weeks.
    Beamtime Accounting:
    ABU BANU BNA Comment
    Owl 3.83 2.06 2.11 MCC beam tune 2 hr, hall access 1.25 hr
    Day 5.06 1.70 1.24 Hall access first 1.5 hr, accelerator magnet problem
    Swing 0.0 1.59 6.41 Controlled access, accelerator magnet problem