1. Begin with BeO target, tune beam, 3x4 raster: Check BPM. Visual Confirm raster size
2. Move to He3 Cell, 2uA, 3x4 raster beam: Compare trigger rate to previous logs
3. increase raster to 6x6mm: spot++, confirm no hot spots
4. reduce raster to 3x4mm, ramp current to 14uA. Check trigger rate, begin production.