User name A. Deur
Log entry time 16:04:18 on January27,2009
Entry number 257984
keyword=day shift summary
continuing run 5609 (happex run 30724)
8:31 stop run 5609, start run 5610.
8:44: . Stop run 5610.
8:48: starting run 5611
8:54: bigBite HV tripped again. In both HV trip cases, it can be correlated with a spike in Compton rates. stop run 5611
8:59: start run 5612
9:28: bigBite HV trip (in the same time the machine tripped). Stop run 5612
9:38: started run 5613. We could have restarted early but the General Accelerator Parameter Guy is displaying (wrongly) that we don't have beam. I called MCC for an update and they told us we have beam. We wasted about 5 min because of this.
10:00 study started. Beam off. stopped runs 5613/30724
Hall is going into controlled access.
3:30 Close the Hall, moved the target is "optics" position, turned off the bigbite wire chamber HV.