User name LeRose
Log entry time 00:02:23 on January 30, 2009
Entry number 258273
keyword=Shift Summary (swing)
Swing Shift 1/29/2009
John LeRose (SL)
Albert Shahinyan (TO)
Production running 14 microAmps
16:18 end of run 5684 0.05615 C
16:18 start run 5685
~16:37 BB HV trip reset fully restored 16:43
17:18 MCC says no beam for about 5 minutes
17:33 MCC restores beam
17:48 run 5685 ends 0.05552 C
17:48 run 5686 starts
19:02 BB HV trip
19:05 BB HV restored
19:12 run 5686 ends 0.0562 C
19:15 run 5687 starts
20:29 end run 5687 0.05667 C
20:30 start run 5688
20:49 BB HV Trip restored in a few minutes
21:06 BB HV Trip and Ion chamber trips. MCC running tune
beam to check it out.
stopped run 5688 0.02846 C
21:11 beam is back
21:12 started run 5689
21:28 BB HV trip
21:32 BB HV restored
22:30 5689 ended 0.05678 C
22:32 started run 5690
23:45 5690 ended 0.05677 C
0.367 C's Total
23:47 5691 started
Good Beam no problems except occasional BigBite HV trips