User name Yoomin
Log entry time 08:10:53 on February 07, 2009
Entry number 259451
keyword=Owl Shift Summary
Owl Shift Summary for Feb 07, 2009
Workers: Yoomin Oh, YaWei Zhang
L-HRS at 45 degree, P0 = 600MeV.
00:00 Target work
01:10 Beam permit, starting BPM scan
02:00 Brad found that the target ladder camera doesn't show what it
is supposed to be show, asked for controlled access, called JP.
03:30 JP and Yawei in the hall to fix the camera related issue.
05:20 Beam permit
05:40 Checked BPM--spot size is ~2mm x 2mm, by the way, spot++ does not
work, it seems that spot++ is looking for a BB run rather than
for a L-HRS run
06:00 Raster size checked with reference cell(nitrogen)
From 3x4 to 6x6 (in MCC unit), seem fine
07:00 Started BPM calibration with single foil optics target,
but no good beam since started.
08:00 BPM calibration starts with BPMs at (-2,-2)