• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name zhangyi

    Log entry time 01:39:17 on February 10, 2009

    Entry number 260148

    keyword=Feb9 Swing shift summary (late entry)

    16:00 shift start with Moller measurement. 16:20 Moller fininshed. Vince asked for control access. 18:30 Control access was finished. Ask for beam back. 19:21 beam back, start turning beam. 20:00 fixed the spot++ problem and restart turning beam. 21:12 Just finished the procedures of beam turning on the run-list, MCC found the compton rate was too high. So ask them work on it. Later MCC called us saying someone asked a control access again. (see log entry 260115) 22:00 MCC asked to change target to Optics again, check for beam position and raster size check. 22:21 Beam come back again, start with Optics target for beam checking. 22:26 move to He3 target, stat with 6x6 raster to check if the rates were same. Then go to 2uA 4x4, start taking elastic data. 22:41 Start the first good run#1203. 23:59 shift ends with 4 good run: 1203, 1204, 1205 and 1206, both of them have 1M event. Run 1207 was started...