Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name E.Chudakov
Log entry time 22:49:55 on February 19, 2009
Entry number 262181
keyword=Moller results
Moller results on Feb 19 20:45-22:40
- Crew: E.Chudakov, A.Glamazdin
- There was no energy lock for the first half of the measurement,
and a lock in ARC2 using
a tool called "PID" (told us by the MCC).
- The raster was ON.
- For the beam energy current - see the chart attached.
Preliminary results: not corrected for the beam
energy fluctuations.
# |
Wien angle |
beam |
runs |
target |
Ptarget% |
Pbeam% |
comments |
1 | 23° | 0.8 µA
| 13193-13196 | 5 | 8.03 |
-74.3±0.2±2.0 | |
2 | 23° | 0.8 µA
| 13197-13200 | 4 | 7.51 |
-73.1±0.2±2.0 | |
3 | 23° | 1.0 µA
| 13201-13204 | 5 | 8.03 |
-74.8±0.2±2.0 | energy lock |
4 | 23° | 1.0 µA
| 13206-13209 | 4 | 7.51 |
-74.2±0.2±2.0 | energy lock |
Aver. | 23° | 1.0
µA | 13201-13209 | 3-4 | - |
-74.5±0.1±2.0 | energy lock |
Figure 1

Figure 2
