NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 19:54:13 on February 22, 2009
Entry number 262716
This entry is a followup to: 262711
Followups:
keyword=Experiment Summary for Feb 18, Swing - Feb 19, Swing
Summary for Feb 18 swing - Feb 19 swing
Smooth data taking.
Beam in Use
shift |
ABU |
BANU |
BNA |
2009/02/18 swing | 4.47 |
1.91 | 1.64 |
2009/02/19 owl | 7.11 |
0.26 | 0.63 |
2009/02/19 day | 6.31 |
0.2 | 1.47 |
2009/02/19 swing | 5.65 |
1.45 | 0.89 |
total | 23.6 |
3.8 | 4.6 |
Main events/issues:
- February 18th
- Resume transverse production
- 16:00-16:20 Controlled access to fix Moller power supply
- 16:22-17:22 Beam profile check
- 17:22-17:45 BigBite trigger check
- 17:50-19:55 Reference cell runs (hydrogen)
- 19:55-20:20 Test runs for Bogdan Wojtsekhowski
- 20:20-22:35 Reference cell runs (nitrogen)
- 23:30 Began kinematic J: Plhrs = 1.42 GeV/c,
45o.
- Target polarization: ~ 63.3% on swing shift 2/21.
- February 19th
- Transverse production for kinematic J.
- Raised BigBite T6 threshold from -120 mV to -133 mV starting
with run 1600.
- 20:00-22:40 Beam tuning for Moller and Moller measurement: 74.5%.
- 22:40-24:00 Beam tuning after Moller.
- 24:00 Resume production.
- Average target polarization: ~ 62.9% from owl shift 2/19
through day shift 2/19.
A copy of this log entry has been emailed to: brads,jpchen,jiang,meziani,choi