Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Fatiha
Log entry time 08:01:01 on February28,2009
Entry number 263839
keyword=Shift Summary
-Shift crew: SL: F. Benmokhtar, TO: Huan Yao, 3rd: Xinhu Yan
-----------
- Running kin K, P0 = 1.51 GeV, beam Energy: 5891.95,
beam current = 15uA.
- 1:30 Lecroy HV alarm went off, slot 11, channel 1 in
the beamline HV was OFF, turned it ON
- 3:39 MCC took beam to improve the quality.
- 3:57 Beam is back, restarted all the DAQs including the Beam ones.
Still so many beam trips
- 4:55 S14 and S15 HV Bigbite HV trips.
- Better beam quality.
- 6:35 Vince called in and asked us to move to the new kinematics.
Started moving the target, set P0 to 1.34 GeV.
- 6:45 Taking a 1/2h N2 run at 5uA with both Bigbite and LHRS.
- 7:15 Moving to 3He production, at 15 uA
- 7:22 Started production running.
-Bigbite runs:
--------------
1886 so many beam trips
1887 // //
1888 // //
1889 ended, MCC took beam to improve the quality
1890
1891 Stopped, Bigbite HV S14 and S15 trips.
1892
1893 Ended to change kineamtics.
-Here starts Kin =I, P0 = 1.34 GeV
---------------------------------
1894 N2 run at 5 uA
1895 3He production at 15 uA
-LHRS runs:
---------
Total Charge was 1.003 Coulomb after run 20444.
20445 0.09130C --- Many beam trips
20446 0.00099C --- Many beam trips
20447 0.03220C --- Ended, MCC took the beam to improve it.
20448 0.09720C ---
20449 0.006 --- Ended, Vince thinks we have the total
change we want for this kinematics.
Total charge at this kinematics: ~1.24 C
-Here starts Kin = I, P0 =1.34:
------------------------------
20450 N2 run at 5 uA.
20451 3He production with 15 uA.