    User name Holmstrom

    Log entry time 16:01:26 on February28,2009

    Entry number 263883

    keyword=Day Shift Summary

    8:00 Shift starts with Production in kinematic I.

    8:25 MCC calls they are having RF troubles.

    8:42 MCC calls beam back.

    9:23 MCC called RF zone is down.

    10:30 Ask MCC to switch the half-wave plate.

    11:30 MCC called beam ready.
    11:40 Nope beam gone

    12:50 Beam Back trying to do HARPs and tune

    14:15 HARPS and raster look good back to production.

    16:00 Shift Ends in production.



    LHRS Runs
    20451 7:20-9:26 426k 3He
    20452 Junk
    20453 14:15-








    BigBite Runs
    1895 7:20-8:12 7M 3He
    1896 Junk
    1897 Junk
    1898 8:43-9:23 5.9M 3He
    1899 JUnk
    1900 14:15-15:10 7M 3He
    1901 15:11-15:31 1.1M 3He
    1902 15:34-