• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name S. Sirca

    Log entry time 23:59:20 on March 6,2009

    Entry number 265012

    keyword=Swing shift SUMMARY


    SWING shift summary: S. Sirca (SL), P. Solvignon (TO), T. Holmstrom (3rd)
    =========================================================================

    EVENTS
    ------
    16:00 took over at runs #2024/#20570 from day shift (kinematics 4I)
    16:32 stop DAQ to perform the Moller measurement
    20:30 Moller measurement done
    20:31 check beam spot size, position, also beam off for a while
    21:10 return to production with about a dozen beam trips per hour

    RUNS
    ----

    Bigbite:

    15:36-16:32 #2024 prod
    21:10-21:57 #2025 prod
    21:58-22:09 #2026 prod
    22:21-22:23 #2027 junk, unstable beam
    22:39-23:37 #2028 prod
    23:38- #2029 prod, passed on to the OWL shift

    HRSL:

    15:36-16:32 #20570 prod
    20:31-20:37 #20571 prod
    21:02-21:05 #20572 for spot check only
    21:10- #20573 prod

    Compton:

    15:10-16:32 #16221
    20:38-23:18 #16241 (the runs in between were done by the Compton crew)


    15:23-16:32 #60747
    21:09-23:18 #60748
    23:20- #60749

    parity:

    15:23-16:32 #30957
    21:09-23:18 #30958
    23:20- #30959