User name S. Sirca
Log entry time 23:59:20 on March 6,2009
Entry number 265012
keyword=Swing shift SUMMARY
SWING shift summary: S. Sirca (SL), P. Solvignon (TO), T. Holmstrom (3rd)
=========================================================================
EVENTS
------
16:00 took over at runs #2024/#20570 from day shift (kinematics 4I)
16:32 stop DAQ to perform the Moller measurement
20:30 Moller measurement done
20:31 check beam spot size, position, also beam off for a while
21:10 return to production with about a dozen beam trips per hour
RUNS
----
Bigbite:
15:36-16:32 #2024 prod
21:10-21:57 #2025 prod
21:58-22:09 #2026 prod
22:21-22:23 #2027 junk, unstable beam
22:39-23:37 #2028 prod
23:38- #2029 prod, passed on to the OWL shift
HRSL:
15:36-16:32 #20570 prod
20:31-20:37 #20571 prod
21:02-21:05 #20572 for spot check only
21:10- #20573 prod
Compton:
15:10-16:32 #16221
20:38-23:18 #16241 (the runs in between were done by the Compton crew)
15:23-16:32 #60747
21:09-23:18 #60748
23:20- #60749
parity:
15:23-16:32 #30957
21:09-23:18 #30958
23:20- #30959