• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Nilanga

    Log entry time 13:07:56 on March13,2009

    Entry number 265885

    keyword=Shift Summary

    HRS-L switched to negative polarity; P0 = 1.12 GeV.

    Runs 20652-20656 (BB runs 2124-2128) are raster checkout runs.
    9.45 - Start production
    10.15 - Beam down for 10 min. (MCC says)
    1,00 - Beam is finally back:



    Production runs:

    HRS-L run/BB run
    20657 2129


    FIGURE 1

    FIGURE 2