    User name miham

    Log entry time 08:03:11 on March15,2009

    Entry number 266254

    keyword=OWL shift summary


    Owl shift summary: Robert Michaels (SL), Miha Mihovilovic (3rd)
    ===================================================================

    EVENTS
    ------
    00:00 The start of the shift. Taking production data.



    08:00 No beam all night. Hall A is still in contolled access.

    00:50 The Bigbite deadtime monitor starts showing negative deadtime
    (-70%) during the run #2164. The online analysis also showed
    huge negative deadtime. There are also peaks missing in the
    BB Cherenkov TDC data etc.

    01:30 Tried to power cycle TS12

    01:45 Started new runs (#2166 and #2167). Deadtime is still negative,
    and peaks in BB Cherenkov TDC data are still missing.

    02:05 Requested for Controlled access.

    02:10 Bob Mihaels, Alexandre Camsonne and Brad Sawatzky went
    down the Hall to fix the problem with BB electronics.


    02:40 Problems "fixed" (see halog). Came out of hall.

    03:00 Restart production

    03:55 Negative dead time reappeares

    06:25 BigBite wire chamber trip. L14.7 tripped (Chamber 2).

    07:23 BigBite wire chamber trip. L14.7 tripped again (Chamber 2).

    RUNS
    ----

    Bigbite:

    23:22-00:14 #2162 Production run, 3He, I = 15 uA, No. events = 6.5M
    00:16-00:50 #2163 Production run, 3He, I = 15 uA, No. events = 6.5M
    00:51-01:14 #2164 Production run, 3He, I = 15 uA, No. events = 5.7M
    (Negative deadtime)

    Runs #2165 - #2173 are test runs ("junk") when we tried to resolve the
    negative dead time problem.

    02:55-02:57 #2174 Spot++ check, 3He, I = 2 uA, No. events = 11k
    03:00-03:55 #2175 Production run, 3He, I = 15 uA, No. events = 6.4M
    (Negative dead time reappeares - 69 %)

    03:56-04:06 #2176 Test run for negative dead time No. events = 1.2M
    04:07-04:56 #2177 Production run, 3He, I = 15 uA, No. events = 6.5M
    04:58-05:33 #2178 Production run, 3He, I = 15 uA, No. events = 4.2M
    05:34-06:24 #2179 Production run, 3He, I = 15 uA, No. events = 5.5M
    (Wire chamber trip)
    06:29-07:23 #2180 Production run, 3He, I = 15 uA, No. events = 5.3M
    (Wire chamber trip)


    HRSL:

    23:22-00:15 #20689 Production run, 3He, I = 15 uA, No. events = 221k
    00:16-00:50 #20690 Production run, 3He, I = 15 uA, No. events = 152k
    00:51-01:40 #20691 Production run, 3He, I = 15 uA, No. events = 96k
    01:40-01:58 #20692 Production run, 3He, I = 15 uA, No. events = 76k
    02:55-02:57 #20693 Spot++ check, 3He, I = 2 uA, No. events = 4k
    03:00-03:55 #20694 Production run, 3He, I = 15 uA, No. events = 224k
    04:05-04:57 #20695 Production run, 3He, I = 15 uA, No. events = 223k
    04:58-05:33 #20696 Production run, 3He, I = 15 uA, No. events = 145k
    05:34-06:24 #20697 Production run, 3He, I = 15 uA, No. events = 198k
    06:29-07:23 #20698 Production run, 3He, I = 15 uA, No. events = 227k